conor 0 #1 February 2, 2010 I've got a Removable Deployment System (from PEA Engineering) and I'm trying to figure out how to attach the long lanyard (that connects to the pilot chute) to the two shorter lanyards (that connect to the pilot chute). The instructions say to use a "larks head knot" but the accompanying photo is not very clear. Can anyone confirm if my attachment method is correct - see attached photo (I've left the knot slack so you can see how it is made but obviously I would tighten it before use). Quote Share this post Link to post Share on other sites
Sabre1Lucke 0 #2 February 2, 2010 Yes it's correct. See attached pictures or google 'larks head knot' Quote Share this post Link to post Share on other sites
Jiggs 0 #3 February 3, 2010 Nice to see that you are getting a new toy; hehe - John is going to be gutted when you beat him at nationals. See you at the pond this weekend (well hopefully if the weather clears)"Don't blame malice for what stupidity can explain." "In our sleep, pain that cannot forget falls drop by drop upon the heart and in our despair, against our will comes wisdom" - Aeschylus Quote Share this post Link to post Share on other sites