I was reading the classifieds and had this question. Regarding reserves what is considered a terminal reserve ride. I could see that some people think a total with reserve deployment means a terminal ride. A baglocked main with reserve deployment you are still hauling ass, and someone may call this a low speed deployment, and it is not.
Ok here it is, as previously noted this is highly subjective very much like what constitutes beautiful. Officially the TSO C23(d) standards and practices document the SAE AS9015 (b) states:
4.3.6.2-After a breakaway vertical velocity must be less than 20'/ sec with an activation with in 2 sec of the breakaway (waaaay less than terminal). The canopy must be "functionally open" within 3 sec + (if needed) 2 more sec giving a total of 5 seconds as the worst case scenario (still pretty darn quick).
All other drops (and openings) 3.4.6- requires a canopy "functionally open" within three seconds of pack opening (regardless of speed)
Additionally: 4.3.9 requires 2 drops of @ least 20 sec (that would be the official standard for a terminal velocity deployment on a reserve canopy) with the canopy "functionally open" within 3 sec.
All that being said, a 10 second delay from a chop would still qualify in most peoples minds as a terminal deployment.
Like I said earlier it's somewhat subjective.
Hope this helps rather than hinders.
Mick.
PS: I was the first person to go through the TSO C23(d)process with a harness/ container system, so I have a little insight as to the "subtle neuoncies" (sp) of the whole process).
You can post now and register later.
If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.
Ok here it is, as previously noted this is highly subjective very much like what constitutes beautiful. Officially the TSO C23(d) standards and practices document the SAE AS9015 (b) states:
4.3.6.2-After a breakaway vertical velocity must be less than 20'/ sec with an activation with in 2 sec of the breakaway (waaaay less than terminal). The canopy must be "functionally open" within 3 sec + (if needed) 2 more sec giving a total of 5 seconds as the worst case scenario (still pretty darn quick).
All other drops (and openings) 3.4.6- requires a canopy "functionally open" within three seconds of pack opening (regardless of speed)
Additionally: 4.3.9 requires 2 drops of @ least 20 sec (that would be the official standard for a terminal velocity deployment on a reserve canopy) with the canopy "functionally open" within 3 sec.
All that being said, a 10 second delay from a chop would still qualify in most peoples minds as a terminal deployment.
Like I said earlier it's somewhat subjective.
Hope this helps rather than hinders.
Mick.
PS: I was the first person to go through the TSO C23(d)process with a harness/ container system, so I have a little insight as to the "subtle neuoncies" (sp) of the whole process).
Share this post
Link to post
Share on other sites